CM Refractories are a proven refractory installation company, working throughout the UK and continental Europe, since 2008.

Refining and Petrochemical Industries are the source for the majority of our contacts. CM Refractories specialise in new installations, repairs, refurbish and emergency shutdown work.

CM Refractories offer a reliable and durable company committed to supplying excellent service in all areas of our scope of work, our craftsmanship is unrivalled.

At our base in the West Midlands we install in excess of 300 tonnes of thin wall erosion lining year on year since our inception in 2008.

Actchem 85 & Resco Products AA-22S are the two primary materials installed by CM Refractories. Although we also have experience with Resco Products R-Max, Ramming Plastic refractories.

Thicker wall installations are also undertaken, both Vibro cast and free flow materials. Shuttering formwork can also be supplied as required to suit customer specification.
The CM Refractory operators are competent fabricators qualified to install a variety of anchor systems, Hexmetal, Vee Anchors, Curl Anchors, Speed cells and Flexmetal.

All personnel are pre-qualified and hold an ECITB Safety Passport.
(Engineering Construction Industry Training Board).
Issued by CCNSG (Client Contractor National Safety Group).

CM Refractories install thick wall linings, by either Vibrocasting or using Free Flow materials. Formwork is usually steel shuttering made in sections and can be supplied to suit Customer specification.

CM Refractories key personnel;
Director Craig Cutler – 28 years refractory services.
Works Manager – Anthony Richards – 19 years installing and welding anchorage systems plus 17 years refractory installation experience.

CM Refractories Partners are;
parnter-logos-new